Completed: March 2025
Nexus Business Park represents a landmark sustainable office development in Manchester's growing technology corridor. This BREEAM Excellent certified complex features 215,000 square feet of Grade A office space across three interconnected buildings, designed to foster collaboration and innovation while minimizing environmental impact.
"The In Group's integrated approach was instrumental in delivering our vision for Nexus Business Park. Their ability to coordinate across construction, staffing, and logistics ensured that our ambitious sustainability goals were met without compromising on quality or timeline. The result is a world-class facility that exceeds our expectations."
Development Director, TechSphere Solutions
Site acquisition completed, architectural plans finalized, and planning permission secured. In-Hire began assembling the project management team.
Site preparation and excavation for underground parking. In-Logistics established material delivery schedules and site security protocols.
Core structures of all three buildings completed. In-Construct coordinated specialized contractors for the innovative curtain wall system.
Exterior façade installation completed. MEP systems and smart building technology integration began. Solar array installation initiated.
Interior finishing work and landscaping of grounds. In-Logistics coordinated furniture delivery and installation for anchor tenants.
Final inspections, BREEAM certification secured, and official opening ceremony. First tenants began moving in immediately after handover.
The success of Nexus Business Park demonstrates the power of our integrated approach, with each of our specialist companies playing a vital role in delivering this complex project.
In-Hire played a crucial role in assembling and managing the skilled workforce needed to deliver this complex project. Our recruitment specialists sourced over 120 skilled professionals across multiple disciplines, ensuring the right expertise was available at each project phase.
Sourced 15 BREEAM specialists and sustainable building experts to ensure certification requirements were met
Implemented dynamic workforce scheduling to optimize labor allocation across all project phases
Delivered specialized training for smart building technology installation and programming
In-Hire maintained a 98% retention rate throughout the 18-month project, significantly reducing delays and training costs typically associated with workforce turnover.
Reduction in recruitment costs compared to industry average for similar-sized projects
In-Construct led the construction process from groundbreaking to completion, implementing innovative building techniques and sustainable practices throughout. Our team managed all aspects of construction, ensuring quality, safety, and adherence to the BREEAM Excellent standards.
Implemented prefabricated construction methods to reduce waste by 35% compared to traditional techniques
Achieved over 500,000 work hours without a lost-time incident through rigorous safety protocols
Utilized BIM Level 3 for enhanced coordination and clash detection throughout construction
In-Construct completed the project two weeks ahead of schedule despite encountering unexpected ground conditions during the foundation phase.
Energy Performance Certificate rating, exceeding the project target of A rating
In-Logistics ensured the smooth flow of materials, equipment, and resources throughout the project lifecycle. Our team implemented just-in-time delivery systems and comprehensive waste management solutions to support the project's sustainability goals.
Coordinated over 1,200 deliveries with 98.5% on-time performance using digital tracking systems
Achieved 94% waste diversion from landfill through sorting, recycling, and repurposing programs
Implemented 24/7 security with advanced access control systems, resulting in zero theft incidents
In-Logistics implemented a digital material tracking system that reduced material waste by 28% compared to industry standards.
Reduction in carbon emissions from logistics operations through route optimization and consolidated deliveries
Our three specialist companies worked in close coordination throughout the project lifecycle, with regular cross-team meetings and shared digital platforms ensuring seamless information flow and decision-making.
Explore the visual transformation of Nexus Business Park from concept to completion through our comprehensive project gallery.
Completed façade featuring high-performance glazing and solar shading elements
Double-height entrance lobby with living wall and natural materials
Flexible workspace with abundant natural light and smart lighting controls
Structural framework during the early construction phase (April 2024)
Combined green roof and 350kW solar photovoltaic system
Landscaped outdoor space with sustainable drainage systems and native planting
Former industrial site before remediation and development
Completed Nexus Business Park with all three buildings and landscaping
The successful delivery of Nexus Business Park has created significant value for our client and set new standards for sustainable commercial development in Manchester.
Completed 2 weeks ahead of the 18-month schedule despite challenging ground conditions
Delivered 3.2% under the £42.5 million budget through efficient resource management
Achieved BREEAM Excellent certification with a score of 78.5%, exceeding the target of 75%
85% pre-let before completion, with remaining space secured within 3 months of handover
Projected 18.5% ROI over 5 years, exceeding initial forecast of 15%
Independent valuation 12% above pre-construction estimates due to sustainability features
100% of initial tenants reported high satisfaction with building quality and amenities
Created capacity for 1,800+ jobs and contributed to local urban regeneration
42% reduction in energy consumption compared to standard office buildings
Rainwater harvesting and efficient fixtures reduce water usage by 65%
94% of construction waste diverted from landfill through recycling and reuse
35% net gain in biodiversity through green roofs and native landscaping
Northwest Property Awards 2025
UK Construction Excellence 2025
Manchester Business Awards 2025
Discover other successful projects where our integrated approach delivered exceptional results.
A 120-unit luxury apartment complex with integrated commercial space and landscaped gardens.
A major transportation interchange connecting rail, bus, and light rail services with commercial facilities.
A state-of-the-art healthcare facility featuring specialized treatment units and sustainable design elements.
Contact us today to discuss how our integrated approach can deliver exceptional results for your next commercial development, residential project, or infrastructure initiative.
123 Business Park, London, EC1A 1BB
+44 (0) 1234 567 890
projects@ingroup.co.uk