In Group Logo
Home Case Studies Nexus Business Park
Back to Case Studies

Nexus Business Park

Manchester, UK 18 Months Commercial £42.5 Million
TechSphere Solutions Logo
Client

TechSphere Solutions

Completed: March 2025

Project Overview

Executive Summary

Nexus Business Park represents a landmark sustainable office development in Manchester's growing technology corridor. This BREEAM Excellent certified complex features 215,000 square feet of Grade A office space across three interconnected buildings, designed to foster collaboration and innovation while minimizing environmental impact.

Key Objectives

  • Create a flagship sustainable office development
  • Achieve BREEAM Excellent certification
  • Implement smart building technology throughout
  • Complete construction within 18-month timeframe
  • Deliver within the £42.5 million budget

Project Scope

  • Three interconnected office buildings (6, 8, and 5 stories)
  • Underground parking for 350 vehicles with EV charging
  • 2.5 acres of landscaped grounds with public spaces
  • Retail and dining facilities on ground floor
  • Rooftop solar array and green roof systems

"The In Group's integrated approach was instrumental in delivering our vision for Nexus Business Park. Their ability to coordinate across construction, staffing, and logistics ensured that our ambitious sustainability goals were met without compromising on quality or timeline. The result is a world-class facility that exceeds our expectations."

Jennifer Zhao

Jennifer Zhao

Development Director, TechSphere Solutions

Project Timeline

Project Initiation & Planning

September 2023

Site acquisition completed, architectural plans finalized, and planning permission secured. In-Hire began assembling the project management team.

Groundbreaking & Foundation Work

November 2023

Site preparation and excavation for underground parking. In-Logistics established material delivery schedules and site security protocols.

Structural Construction

February 2024

Core structures of all three buildings completed. In-Construct coordinated specialized contractors for the innovative curtain wall system.

Building Envelope & Systems

July 2024

Exterior façade installation completed. MEP systems and smart building technology integration began. Solar array installation initiated.

Interior Fit-Out & Landscaping

November 2024

Interior finishing work and landscaping of grounds. In-Logistics coordinated furniture delivery and installation for anchor tenants.

Project Completion & Handover

March 2025

Final inspections, BREEAM certification secured, and official opening ceremony. First tenants began moving in immediately after handover.

Collaborative Approach

Integrated Solutions

The success of Nexus Business Park demonstrates the power of our integrated approach, with each of our specialist companies playing a vital role in delivering this complex project.

Talent Acquisition & Workforce Management

In-Hire played a crucial role in assembling and managing the skilled workforce needed to deliver this complex project. Our recruitment specialists sourced over 120 skilled professionals across multiple disciplines, ensuring the right expertise was available at each project phase.

Specialized Recruitment

Sourced 15 BREEAM specialists and sustainable building experts to ensure certification requirements were met

Workforce Scheduling

Implemented dynamic workforce scheduling to optimize labor allocation across all project phases

Training Programs

Delivered specialized training for smart building technology installation and programming

Workforce Composition

Key Achievement

In-Hire maintained a 98% retention rate throughout the 18-month project, significantly reducing delays and training costs typically associated with workforce turnover.

32%

Reduction in recruitment costs compared to industry average for similar-sized projects

Construction Management & Execution

In-Construct led the construction process from groundbreaking to completion, implementing innovative building techniques and sustainable practices throughout. Our team managed all aspects of construction, ensuring quality, safety, and adherence to the BREEAM Excellent standards.

Sustainable Construction

Implemented prefabricated construction methods to reduce waste by 35% compared to traditional techniques

Safety Management

Achieved over 500,000 work hours without a lost-time incident through rigorous safety protocols

Technical Innovation

Utilized BIM Level 3 for enhanced coordination and clash detection throughout construction

Sustainability Features Implemented

Key Achievement

In-Construct completed the project two weeks ahead of schedule despite encountering unexpected ground conditions during the foundation phase.

A+

Energy Performance Certificate rating, exceeding the project target of A rating

Supply Chain & Site Logistics

In-Logistics ensured the smooth flow of materials, equipment, and resources throughout the project lifecycle. Our team implemented just-in-time delivery systems and comprehensive waste management solutions to support the project's sustainability goals.

Material Management

Coordinated over 1,200 deliveries with 98.5% on-time performance using digital tracking systems

Waste Management

Achieved 94% waste diversion from landfill through sorting, recycling, and repurposing programs

Site Security

Implemented 24/7 security with advanced access control systems, resulting in zero theft incidents

Material Sourcing

Key Achievement

In-Logistics implemented a digital material tracking system that reduced material waste by 28% compared to industry standards.

42%

Reduction in carbon emissions from logistics operations through route optimization and consolidated deliveries

Collaboration Visualization

Integrated Solutions Collaboration Diagram

Our three specialist companies worked in close coordination throughout the project lifecycle, with regular cross-team meetings and shared digital platforms ensuring seamless information flow and decision-making.

Visual Journey

Project Gallery

Explore the visual transformation of Nexus Business Park from concept to completion through our comprehensive project gallery.

Before & After Comparison

Before Development

Before: September 2023

Former industrial site before remediation and development

After Completion

After: March 2025

Completed Nexus Business Park with all three buildings and landscaping

Project Outcomes

Results & Impact

The successful delivery of Nexus Business Park has created significant value for our client and set new standards for sustainable commercial development in Manchester.

On-Time Delivery

Completed 2 weeks ahead of the 18-month schedule despite challenging ground conditions

Budget Performance

Delivered 3.2% under the £42.5 million budget through efficient resource management

Sustainability

Achieved BREEAM Excellent certification with a score of 78.5%, exceeding the target of 75%

Occupancy Rate

85% pre-let before completion, with remaining space secured within 3 months of handover

Business Impact

Return on Investment

Projected 18.5% ROI over 5 years, exceeding initial forecast of 15%

Property Value

Independent valuation 12% above pre-construction estimates due to sustainability features

Tenant Satisfaction

100% of initial tenants reported high satisfaction with building quality and amenities

Local Economic Impact

Created capacity for 1,800+ jobs and contributed to local urban regeneration

Sustainability Outcomes

Energy Efficiency

42% reduction in energy consumption compared to standard office buildings

Water Conservation

Rainwater harvesting and efficient fixtures reduce water usage by 65%

Waste Management

94% of construction waste diverted from landfill through recycling and reuse

Biodiversity

35% net gain in biodiversity through green roofs and native landscaping

Awards & Recognition

Sustainable Building Award

Northwest Property Awards 2025

Innovation in Construction

UK Construction Excellence 2025

Best Commercial Development

Manchester Business Awards 2025

Explore More

Related Case Studies

Discover other successful projects where our integrated approach delivered exceptional results.

Riverside Heights Development
Residential London, UK

Riverside Heights Development

A 120-unit luxury apartment complex with integrated commercial space and landscaped gardens.

In-Construct In-Hire In-Logistics
View Case Study
Central Transit Hub
Infrastructure Birmingham, UK

Central Transit Hub

A major transportation interchange connecting rail, bus, and light rail services with commercial facilities.

In-Construct In-Hire In-Logistics
View Case Study
Westfield Medical Center
Healthcare Bristol, UK

Westfield Medical Center

A state-of-the-art healthcare facility featuring specialized treatment units and sustainable design elements.

In-Construct In-Hire In-Logistics
View Case Study
Start Your Project

Interested in a Similar Project?

Contact us today to discuss how our integrated approach can deliver exceptional results for your next commercial development, residential project, or infrastructure initiative.

Head Office

123 Business Park, London, EC1A 1BB

Phone

+44 (0) 1234 567 890

Email

projects@ingroup.co.uk